Normally, double-length spools (24 metres) are treated in Waspik. But when the order from ETA Tankput 83 came in, Waspik did not have any production capacity available. This meant a first for Oosterhout: treating 24-metre-long spools.
Staff at our Oosterhout site came through this test with flying colours. The lengths meant more work, but the team pulled it off. So we can now also handle these kinds of lengths in Oosterhout, which are often favoured by clients as they involve fewer welds. The spools have already been shipped to Amsterdam, where they will be used to build the Tank Terminal.