Commissioned by Van Der Zalm Metaalindustrie, we took care of abrasive blasting, metallisation with zinc aluminium, and application of a 3-layer paint system for this cycle bridge. After we finished our work on this bridge, a third party treated the surface and the bridge was installed in the night between 28 and 29 November. The end product is a 48-tonne cycle bridge of 45 metres long and 3.7 metres wide.