Materials are shipped in and out by road or by ship, because our Straco Waspik site is also located on an easy-to-access waterway. Impressive cranes, each with a lifting capacity of over 30 tonnes, move the steel to one of the four immense production lines for processing. The largest of the units at the Straco Waspik plant is 200 metres long, and equipped with interior transport systems, blast rooms, and paint chambers that are all designed to handle large structures.
Even for exceptionally large orders, Straco Waspik can offer short lead times!